By the end of February 2021, regarding Tan My Irrigation Project, Construction Joint Stock Company 47 (the leader of Joint Venture) has completed key work items in the project: conducting the roller compacted concrete of the main dam right and left abutment to the EL.197.20 meters; executing lining concrete of the main dam right abutment from the 11th to 24th compartment and the 1st to the 10th compartment for the main dam left abutment, concrete of the spillway dam and the whole systems of diversion drainage, upstream wall, downstream wall and the back yard of the main dam.
In the future, Construction Joint Stock Company 47 will make consistent concentration on manpower and construction equipment to set up pin pillars, adjacent piers of the spillway dam; finish beam casting and installation for transportation bridges; complete construction of operation house, diversion drainage and remaining items in order to put the project in operation.