By the end of October 2019, at Tan My Irrigation Project, Construction Joint Stock Company 47 (Head of the consortium) carried out the construction of RCC on the right bank to the elevation 175 and the section across the riverbed to elevation 167 , RCC concrete volume reaches 110,000 m3.

