* / For details: See here
C47 > Information > Bidding > Announcement on the equipment liquidation results in the 2nd stage 2018
RELATED POSTS
![Ka Zam Reservoir Project](https://www.xaydung47.vn/wp-content/uploads/2024/01/C47-Kazam-2024-images-Eng.jpg)
Ka Zam Reservoir Project
Location of works: Don Duong District, Lam Dong Province, Viet Nam Length of Dam: 280.7m Height of Crest: 41.78m Main volume of works: + Rock & soil excavation: 151,314,000m3 + ...
![Ta Hoet Reservoir Project](https://www.xaydung47.vn/wp-content/uploads/2024/01/C47-Ta-Hoet-Eng-images.jpg)
Ta Hoet Reservoir Project
Location of works: Duc Trong District, Lam Dong Province, Viet Nam Length of Dam: Height of Crest: Main volume of works: + Rock & soil excavation: 118,273,000m3 + Rock & ...
![Nam Phak Hydropower Project](https://www.xaydung47.vn/wp-content/uploads/2022/08/c47-thumbnail-nam-phak.jpg)
Nam Phak Hydropower Project
Project Location: Paksong district, Champasak province, Lao PDR Main Volume: + Rock and soil excavation: 3,202,310,000m3 + Rock and soil filling: 4,570,950,000m3 Construction Period: + Commencement: Quarter 4/2022 + Completion: ...
![Construction of Infrastructure Facilities under Becamex VSIP Binh Dinh Project](https://www.xaydung47.vn/wp-content/uploads/2022/08/image-thumbnail-c47-20220813.jpg)
Construction of Infrastructure Facilities under Becamex VSIP Binh Dinh Project
Project Location: Canh Vinh commune, Van Canh district, Binh Dinh province Main Volume: + Rock gabion: Length of 3,440m with volume of 40,755m3 rubble stone + Rock and soil excavation: ...
![Long Thanh Airport](https://www.xaydung47.vn/wp-content/uploads/2022/08/C47-san-bay-Long-Thanh-thumbnail-1.jpg)
Long Thanh Airport
Location of works: Long Thanh District, Dong Nai Province, Viet Nam Main volume of works: + Rock & soil excavation: 94.000m3 + Rock & soil fill: 80.000m3 Works duration: + ...