Ka Zam Reservoir Project
Location of works: Don Duong District, Lam Dong Province, Viet Nam Length of Dam: 280.7m Height of Crest: 41.78m Main volume of works: + Rock & soil excavation: 151,314,000m3 + ...
Ta Hoet Reservoir Project
Location of works: Duc Trong District, Lam Dong Province, Viet Nam Length of Dam: Height of Crest: Main volume of works: + Rock & soil excavation: 118,273,000m3 + Rock & ...
Nam Phak Hydropower Project
Project Location: Paksong district, Champasak province, Lao PDR Main Volume: + Rock and soil excavation: 3,202,310,000m3 + Rock and soil filling: 4,570,950,000m3 Construction Period: + Commencement: Quarter 4/2022 + Completion: ...
Construction of Infrastructure Facilities under Becamex VSIP Binh Dinh Project
Project Location: Canh Vinh commune, Van Canh district, Binh Dinh province Main Volume: + Rock gabion: Length of 3,440m with volume of 40,755m3 rubble stone + Rock and soil excavation: ...
Long Thanh Airport
Location of works: Long Thanh District, Dong Nai Province, Viet Nam Main volume of works: + Rock & soil excavation: 94.000m3 + Rock & soil fill: 80.000m3 Works duration: + ...