* Location of construction: Vinh Thanh District, Binh Dinh Province
C47 > Works & Projects > Hydroelectric Works > Reservoir system of Vinh Son Hydropower Works (Weir A)
RELATED POSTS
![Nam Phak Hydropower Project](https://www.xaydung47.vn/wp-content/uploads/2023/10/c47-nam-phak-lao-20220830-250-188.jpg)
Nam Phak Hydropower Project
Project Location: Paksong district, Champasak province, Lao PDR Main Volume: + Rock and soil excavation: 3.202.310m3 + Rock and soil filling: 4.570.950m3 Construction Period: + Commencement: Quý 4/2022 + Completion: ...
![Hoa Binh Hydropower Plant Expansion Project](https://www.xaydung47.vn/wp-content/uploads/2023/10/C47_NMTD-HBMR_20220813-250-188.jpg)
Hoa Binh Hydropower Plant Expansion Project
Project Location: Tan Thinh ward, Hoa Binh city, Hoa Binh province Main Volume: + Rock and soil excavation: 248.000m3 + CVC works: 94.000m3 Construction Period: + Commencement: Quarter 1/2021 + ...
![Thuong Kon Tum Hydropower Project](https://www.xaydung47.vn/wp-content/uploads/2018/10/C47-TKT-Hydropower-20220519-250-188.jpg)
Thuong Kon Tum Hydropower Project
Location: Kon Ray and Kong Plong District, Kom Tum Province, Viet Nam Length of weir crest: 274m Height of weir crest: 76.6m Main volume of implementation: + Rock & soil ...
![Trung Son Hydropower project](https://www.xaydung47.vn/wp-content/uploads/2018/10/trung-son-20220519.jpg)
Trung Son Hydropower project
Location of site: Trung Son Commune, Quan Hoa District, Thanh Hoa Province, Viet Nam LInstalled capacity: 260 MW Number of Units: 4 Mean Annual Electricity Production: 1055.03 million KWh Duration ...