TRANG CHỦ   SƠ ĐỒ WEBSITE   LIÊN HỆ 
Hydraulic Works
Hydroelectric Works
Civil & Industrial construction works
Construction image
Completed works pictures
Video Clip


Hit Counter
46513476

  WORKS & PROJECTS >> Construction image
Some pictures of Trung Son Hydropower Project - Thanh Hoa provice, VietNam (25-May-2014)

Next

Some images of Van Phong hydropower projects (12-Jan-2014)


 Mounting position No3 unit

Next

Some images of Van Phong rolling weir (09/2013)


Downstream of Dam

Next

The spillways Thuong Kon Tum hydropower (Photo taken on 16/7/2013)

Next

Van phong dam construction (06/02/2013)

Next

Some photos of construction of Trung Son Hydropower (05/2013)

Next

Pictures beam of A Luoi hydropower works (photo taken on 30/10/2012)


Panorama of the main dam

Next

Song Bung 5 hydropower works - prepare integrated water generator (picture taken day 25/10/2012)


 Panora of works

Next

Some pictures construction of Tien Thuan hydropower works (picture taken day 28/10/2012)


Factory downstream

Next
Well water purification system

The TBM 390E has successfully performed the first meters of boring

Construction Joint stock company 47 reached the top 500 largest enterprises in Vietnam

Operation successful tunnel boring machine tbm 390e Servicing da nhim hydropower plant expansion project

The Joint-venture CC47and ROBBIN USA implemented to drill 200m long of the tunnel thanks to TBM technology - Thuong Kon tum Hydropower Project after 2 years suspension (photo 06.30.2016); Shift rails in the next position; Rock face after drilling

 

Home   Sitemap   Contact
47 Construction Joint-Stock Company - 08th Bien Cuong - Quy Nhon. Tel: (056) 3522166. Fax: (056) 3522316
Copyright © 47 Construction Joint-Stock Company.