  TECH & MACHINERY >> Roller-compacted Concrete
List of equipments
Batching plants:
   
 
No. Name of equipments Capacity/
Technical characteristics
Quantities
1  Batching plants IMI 360m3  360 m3/h 01
2  Batching plants IMI 120m3  120 m3/h 05
3  Batching plants IMI 60m3  60 m3/h 05
4  Batching plants IMI 30m3  30 m3/h 01
   
Concrete mixer trucks:
   
 
No. Name of equipments Capacity/
Technical characteristics
Quantities
1  Hyundai HD270  250KW-15T 06
2  Daewoo  287KW-12.63T 04
3  Hino MBSOSM  243 KW 03
4  Hino  140 KW 01
5  Dongfeng  250KW-11,87T 12
6  FORLAND  96KW, 3M3 02
7  Ssangyong DA50  228KW-14,915T 03
8  Kraz 258  177 KW 01
9 Kraz 257  176 KW 06
10  Kraz 256 B1  176 KW 02
11  Kraz SV194  176 KW 03
   
Compactors:
   
 
No. Name of equipments Capacity/
Technical characteristics
Quantities
1  Bomag BW212D2  85KW-23T

01

2  Sakai SV500TF  92KW-25T 03
3  Bomag BW212PD3  90 KW-28T 01
4  Bomag BW212PD-3  91 KW-28T 02
5  Bomag BW213PDH-3  107,5KW-27,5T 04
6  Sakai SV512T  25T 01
7  Bomag BMP851  19PS-1,548T 02
8  Caterpillar D330  280KW-23T 01
9  Sakai SV512T-H  25T 05
10  Bomag BW161AD-4  74,9KW-12,8T 03
11  Bomag BW161AD  74,9KW-12,8T 01
12  Bomag BW100AD-4  25,2KW-4,2T 01
13  Sakai SW800  20T 02
14  Bomag BW213PDH-3 107,5KW-27,5 04
15  Vibrator Worker  2,2 KW   04
16  Vibrator Mikasa  2,2 KW 04
17  Vibrator Kubota KX251A-BH160  59PS 04
   
Next
Well water purification system

The TBM 390E has successfully performed the first meters of boring

Construction Joint stock company 47 reached the top 500 largest enterprises in Vietnam

Operation successful tunnel boring machine tbm 390e Servicing da nhim hydropower plant expansion project

The Joint-venture CC47and ROBBIN USA implemented to drill 200m long of the tunnel thanks to TBM technology - Thuong Kon tum Hydropower Project after 2 years suspension (photo 06.30.2016); Shift rails in the next position; Rock face after drilling

 