  TECH & MACHINERY >> Filling works
List of equipment for filling works
Bulldozers:
   
 
No. Name of equipments Capacity/
Technical characteristics
Quantities
1  Caterpillar D6H  180PS 03
2  Caterpillar D6H  127KW 02
3  Caterpillar D6H  123KW 02
4  Caterpillar D6R  127KW 02
5  Caterpillar D6R  199HP 03
6  Caterpillar D5K  127KW 01
7  Caterpillar D5MX   01
8  Fiat Alis 120C  88KW 01
9  Fiat Alis 14C  103KW 08
10  Komatsu D65PX-12E  140KW 02
11  Komatsu D65E-12  131KW 02
12  Komatsu D65A-6  103KW 06
13  Komatsu D41P-6E  106PS 01
14  Komatsu D40 P-5  95 PS 01
15  Komatsu D39EX-21A  95PS 01
   
Compactors:
   
 
No. Name of equipments Capacity/
Technical characteristics
Quantities
1  Cat 831  22T 01
2  Cat CS583E  41T 01
3  Caterpillar D330  280KW-23T 01
4  Bomag BMP851  19PS-1,548T 02
5  Bomag BW213PDH-3 107,5KW-27,5 04
6  Bomag BW213PDH-3  107,5KW-27,5T 04
7  Bomag BW212PD3  91 KW-28T 01
8  Bomag BW212PD-3  90 KW-28T 01
9  Bomag BW212D-2  85KW-23T

01

10  Bomag BW161AD-4  74,9KW-12,8T 03
11  Bomag BW161AD  74,9KW-12,8T 01
12  Bomag BW100AD-4  25,2KW-4,2T 01
13  Sakai SW800  20T 02
14  Sakai SV512T-H  25T 02
15  Sakai SV512T  25T 01
15  Sakai SV500TF  92KW-25T 03
16  Sakai SV160DV  21-30T(120KW,161HP) 01
17  Sakai SV512D-H (trống trơn)  25T 03
Graders:
   
 
No. Name of equipments Capacity/
Technical characteristics
Quantities
1  Máy san bánh lốp Misubishi LG-2  125PS-Lam 3,71m

04

   
Next
Well water purification system

The TBM 390E has successfully performed the first meters of boring

Construction Joint stock company 47 reached the top 500 largest enterprises in Vietnam

Operation successful tunnel boring machine tbm 390e Servicing da nhim hydropower plant expansion project

The Joint-venture CC47and ROBBIN USA implemented to drill 200m long of the tunnel thanks to TBM technology - Thuong Kon tum Hydropower Project after 2 years suspension (photo 06.30.2016); Shift rails in the next position; Rock face after drilling

 