TRANG CHỦ   SƠ ĐỒ WEBSITE   LIÊN HỆ 
Hydraulic Works
Hydroelectric Works
Civil & Industrial construction works
Construction image
Completed works pictures
Video Clip


Hit Counter
47352261

  WORKS & PROJECTS >> Hydraulic Works
An Trach self spillway dam
25/10/2012 4:08:40 PM

 

 

   *  Built in: Hoa Vang district, Da Nang City 
 

       + Dam of length

 : 73.2m
   * Main amount:
         + Kinds of gravelly soil excavations  : 271,736m3
         + Kinds of gravelly soil cover up  : 260,168.9m3
         + Kinds of Concrete  : 7,571.5m3
   * Time that started and finished this project :
         + Start     : 05/1998
         + Finish   : 03/2000
*/ Viewer pictures of works here:


Other News
Well water purification system

The TBM 390E has successfully performed the first meters of boring

Construction Joint stock company 47 reached the top 500 largest enterprises in Vietnam

Operation successful tunnel boring machine tbm 390e Servicing da nhim hydropower plant expansion project

The Joint-venture CC47and ROBBIN USA implemented to drill 200m long of the tunnel thanks to TBM technology - Thuong Kon tum Hydropower Project after 2 years suspension (photo 06.30.2016); Shift rails in the next position; Rock face after drilling

 

Home   Sitemap   Contact
47 Construction Joint-Stock Company - 08th Bien Cuong - Quy Nhon. Tel: (056) 3522166. Fax: (056) 3522316
Copyright © 47 Construction Joint-Stock Company.