Song Sao water reservoir project land dam
7/11/2008 10:35:40 AM

 

 Built in: Nghia Dan district, Nghe An province
 The top of dam length : 445 m
 The max dam height   : 31 m
 Main amount
      + Kinds of gravelly soil excavations : 50,531 m3
      + Kinds of gravelly soil cover up : 438,378 m3
      + Kinds of Concrete : 540 m3
 Time that started and finished this project :
      + Start   : 07/2000
      + Finish : 08/2003



Other News
Well water purification system

The TBM 390E has successfully performed the first meters of boring

Construction Joint stock company 47 reached the top 500 largest enterprises in Vietnam

Operation successful tunnel boring machine tbm 390e Servicing da nhim hydropower plant expansion project

The Joint-venture CC47and ROBBIN USA implemented to drill 200m long of the tunnel thanks to TBM technology - Thuong Kon tum Hydropower Project after 2 years suspension (photo 06.30.2016); Shift rails in the next position; Rock face after drilling

 